Road border crossing between Poland and Ukraine

Obiekt przemysłowy - Drogowe przejście graniczne Polska - Ukraina
Zrealizowana

Road border crossing between Poland and Ukraine


Rok
2009
Zakres realizacji
Steelwork installation
Obiekty
Industrial facility
Miejsce
Dołhobyczów

JBCONSTRUCTION has commissioned us to carry out assembly work on the steel structure of the W1 shelter and auxiliary buildings. The project, with an area of 11,000 sqm and a tonnage of 889 tonnes, was carried out on the site of the Poland-Ukraine road border crossing located in Dołhobyczów, in the Lublin Voivodeship.

Opinia inwestora

Obiekt przemysłowy - Drogowe przejście graniczne Polska - Ukraina
Road border crossing between Poland and Ukraine
Road border crossing between Poland and Ukraine
In 2009, COMMERCECON installed for us the steelwork for umbrella roof W1 and for auxiliary buildings. The construction works were performed at the road border crossing between Poland and Ukraine in Dołhobyczów, Lubelskie Voivodeship.
The works covered an area of 11,000 m2 and 889 tonnes of steel were used.
Jacek Borowik, JB Construction, Director

Zobacz podobne realizacje

Obiekt przemysłowy - Weber Saint Gobain - silosowa stacja mieszalnikowa
Zrealizowana
Weber Saint Gobain – silosowa stacja mieszalnikowa
Industrial facility
Szwecja/Tullinge
Zobacz realizację
Obiekt przemysłowy - Wytwórnia Klejów i Zapraw Budowlanych ATLAS
Zrealizowana
ATLAS S.A. – manufacturer of construction adhesives and mortars
Industrial facility: 1900 m2
Zgierz
Zobacz realizację
Apartamenty DEN KONGELIGE MONT
Zrealizowana
DEN KONGELIGE MONT – suites
Industrial facility
Copenhagen/Denmark
Zobacz realizację
en pl
Contact us
Send a quick query

    Personal data
    Technical data